Our Projects

Current Projects

Our current jobs:

P500 Apron

The Darwin Pipeline Duplication

LIA

Next Data Centre – Darwin

Our Past Projects

Some of our successful projects include: 

Air 7000

CDU Landscaping

Military Working Dogs

Kangaroo Flats Control Precinct – Kangaroo Flats

Millner Child Care Centre

Mt Bundey​

RAAF Darwin and Larrakeyah Joint Health Command

US Force Posture Initiative for Air Movements Facility — US Force Posture Initiative

AIG Offices

Swell Swimming Pool Complex

Core Lithium Concrete Works ​

Jet Fuel Storage Tanks

TSA Palmerston Residential Facility

Pine Creek Power Station Upgrade

Bidfood East Arm

Adelaide River Civil Works

Robertson Barracks Range Control Precinct

Flood Mitigation

East Arm Bulk Fuel Facility

Processing Plant Ongoing Works

Workers Accommodation Village (WAV)

Earth Cover Magazines

Bulk Jet Fuel Storage Tanks

Air 7000

The project entails extensive excavation for footings, concrete slabs of varying thicknesses, and construction of pits and trenches for Triton maintenance hangar, FOB fuel offload shelter, mechanical plant shelter, service infrastructure building, firewater, and waste storage tanks.

CDU Landscaping

Our specializes in providing comprehensive solutions for concrete footing, seating walls, and retaining walls installation, all in accordance with specific project drawings.

Military Working Dogs

Involves civil and concrete work. The new Military Working Dogs (MWD) project includes the development of essential support facilities.

Kangaroo Flats Control Precinct – Kangaroo Flats

Civil and Concrete works for administrative and support facilities and infrastructure.

Millner Child Care Centre

Bear Claw Contracting has been engaged to deliver a range of civil and concrete works including site cleaning, earthworks, subgrade preparation, line marking, detailed excavation, stormwater installation, and the construction of concrete footings and slabs. Our team is responsible for the full delivery of these services, ensuring all works are completed to specification and in compliance with safety, environmental, and quality standards. With a focus on precision and project efficiency, Bear Claw Contracting continues to deliver reliable outcomes across all stages of site development.

Mt Bundey

Civil and Concrete – Road and Heli Pad Construction, Import and compact 40,000-tonne fill.

RAAF Darwin and Larrakeyah Joint Health Command

Concrete – Detailed Excavations, Pad Footings, Retaining Walls, Ground Slabs, Suspended Slabs

Civil Works – Cut and Fill, Bulk Excavation, Worked around Asbestos Conditions.

Air Movements Facility

Concrete – Detailed Excavation, Precast Panels, Suspended Slabs, Ground Slabs, Roads, Footpaths, Pavements, Ramps, Stormwater, Kerbs, Headwalls, Wing Walls, Apron Slab

AIG Offices

Civil – Clear and Grub, Prep Subgrade, Trenching, Install Culverts.

Concrete – Detailed Excavation, Ground slab, Suspended Slab, Kerb Ramp.

Swell Swimming Pool Complex

Concrete – Detailed Excavation, Footings, Balance Tanks, Piers, Columns, Ground Slabs, Footpaths, and Coloured Concrete.

Core Lithium Concrete Works

Ongoing Concrete and Civil Work to support mining operations.

Jet Fuel Storage Tanks

Civil – Bulk Excavation, Import of 200,000 tonnes of fill, Backfilling, Gravel Compaction to underside of Buildings and Roads and Pavements.

Concrete – Detailed Excavation, Stairs, Tank Base, Wall and Roof and Pad Footings.

TSA Palmerston Residential Facility

Concrete – Detailed Excavation, Ground Slabs, Blockfill, Block work, Civil – Clear and Grub, Cut & Fill, Trenching.

Pine Creek Power Station Upgrade

Concrete – Precast Panels, Ground Slabs, Hob Walls, Blast Wall Extension with Built-in Situ, Pedestal Bases.

Bidfood East Arm

Civil – Clear and Grub, Cut and Fill, Prep Subgrade, Final Trim, Stormwater.

Adelaide River Civil Works

Civil – Install Culverts, Strip Topsoil, import Lay and Compact General Fill, Trim and Compact Subgrade, Import, Lay, Compact and Trim Road Base.

Robertson Barracks Range Control Precinct

Concrete – Detailed Excavation, Ground Slabs, Pad footings, Strip Footings, Electrical Pits, and Suspended Slab.

Flood Mitigation

Concrete – Footings, Culvert Slab Base, Headwalls, Retaining Walls, Stormwater Inlets.

East Arm Bulk Fuel Facility

Concrete – 11 Ring Beams.

Processing Plant Ongoing Works

Concrete – Ground slab, Walls, Pad footing, Pedestals.

Workers Accommodation Village (WAV)

Concrete – Carpark Extension, Footpath, Swale Treatment Under Suspended Walkways, Pavements, Ramps, Ground Slabs.

Earth Cover Magazines

Concrete – Detailed Excavations, Strip Footings, Hob Walls, Wing Walls, Ground Slabs, Insitu Wing Wall Ends, PCC Roof Slabs, Pavement Slabs.

Bulk Jet Fuel Storage Tanks

Concrete- Detailed Excavation, Footings, Ground Slabs, Pedestals, Concrete Walls, Suspended Slabs, Pits Walls, 2 x 8M Litre Fuel Tanks with a Curved Jump Form.